VERRAZANO-NARROWS
NEW YORK, NY
PROJECT INFORMATION
CONTRACT NO. VN-80B
Replacement of the Upper Level Roadway Deck Suspended Span
Competent Person: George Lyras
Personnel Employed: 20
3/13 – CURRENT
PROJECT DETAILS
Materials Applied:
Organic Zinc Primer, Epoxy Intermediated, Urethane Finish
Equipment Used:
Recycling Unit, Dust Collector, Air Compressors, Spray Guns, Needle guns, Decon Facility, Griners, Brushes, Rollers
Environmental Controls:
Class 1A and 3P Containments
Ventilation Methods:
Forced air
Coating Removal Methods:
Blasting and needle guns
Special Requirements:
Containment, collection and disposal of waste.