GEORGE WASHINGSTON BRIDGE
FORT LEE, NJ
PROJECT INFORMATION
CONTRACT NO. GWB 244.022
George Washington Bridge Main Span Rehabilitation
Lead Abatement and Painting
Competent Person: George Lyras
Personnel Employed: 38
6/11 – 9/15
PROJECT DETAILS
Materials Applied:
Organic Zinc Primer, Epoxy Intermediate, Urethane Finish
Equipment Used:
Air compressors, needle guns, decon facility, grinders,
brushes, rollers, traffic control devices, etc.
Environmental Controls:
Class 3P Containment
Ventilation Methods:
Crossflow utilizing vents in containment walls
Coating Removal Methods:
Needle Guns, grinders, Slurry blasts
Special Requirements:
Containment, collection and disposal of waste.