ATLANTIC BEACH BRIDGE
ATLANTIC BEACH, NY
PROJECT INFORMATION
Project Number NA
Atlantic Beach Bridge over Reynolds Channel
Cleaning and Painting
Competent Person: Geroge Lyras
Personnel Employed: 15
SEPTEMBER 16 – PRESENT
PROJECT DETAILS
Materials Applied:
Zinc, Epoxy, and Polyurethane
Equipment Used:
Air compressors, needle guns, decon facility, grinders, brushes, rollers, traffic control devices, etc.
Environmental Controls:
3P Containment
Ventilation Methods:
Dust collection
Coating Removal Methods:
Needle Guns, and Grinders.
Special Requirements:
Shielding Installation